PUBLICATIONS Journal
Papers, Books, Book Chapters,
Lectures, Conference
Papers
Theses
Computer
Integrated Construction: Project Data Model Representation and Use
Doctoral
Thesis, Technion –
EIDOCC - Expert
Interactive Design of Concrete Columns
Master’s
Thesis, MIT – Massachusetts Institute of Technology, 1985.
Refereed papers in professional journals
1.
Sacks, R., and Buyukozturk,
O., (1987), ‘Expert Interactive Design of Concrete Columns under Bi-axial
Bending’, ASCE Journal of Computing in Civil Engineering, Vol. 1 No. 2
pp. 69-81.
2.
Sacks, R., and Warszawski,
A., (1997), ‘A
Project Model for an Automated Building System; Design and Planning Phases’,
Automation in Construction, Elsevier Science B.V., Vol. 7 pp. 21-34.
3.
Sacks, R., (1998), ‘Issues
in the Development and Implementation of a Building Project Model for an
Automated Building System’, International Journal of Construction
Information Technology,
4.
Sacks, R., Warszawski,
A., and Kirsch, U., (2000), ‘Structural
Design in an Automated Building System’, Automation in
Construction, Elsevier Science B.V., Vol. 10 No. 1 pp. 181-197.
5.
Sacks, R., (2002), ‘Integrated
AEC Information Services using Object Methods and a Central Project Model’,
Computer-Aided Civil and Infrastructure Engineering, Blackwell
Publishers, Boston USA & Oxford UK, Vol. 17 No.6 pp. 449–456.
6.
Sacks, R., Navon, R., and Goldschmidt,
E., (2003), ‘Building
Project Model Support for Automated Labor Monitoring’, ASCE
Journal of Computing in Civil Engineering, Vol.17 No.1 pp. 19-27.
7.
Sacks, R., Eastman, C.M., and Lee, G.,
(2003) ‘Process
Improvements in Precast Concrete Construction Using Top-Down Parametric 3-D
Computer-Modeling’, Journal of the Precast/Prestressed Concrete
Institute, Vol. 48 No. 3 pp. 46-55.
8.
Eastman, C.M., Sacks, R., and Lee, G.,
(2003), ‘Development
and Implementation of Advanced IT in the North American Precast Concrete
Industry’, ITCON - Electronic Journal of Information Technology in
Construction, Vol. 8, pp. 247-262.
9.
Sacks, R., Eastman, C.M., and Lee, G.,
(2004) ‘Process
Model Perspectives On Management and Engineering Procedures in the
Precast/Prestressed Concrete Industry’, ASCE Journal of
Construction Engineering and Management, Vol. 130 No. 2 pp. 206-215.
10. Sacks, R., Eastman, C.M., and Lee, G.,
(2004), ‘Parametric
3D Modeling in Building Construction with Examples from Precast Concrete’,
Automation in Construction, Elsevier Science B.V., Vol. 13 No. 3 pp.
291-312.
11. Warszawski, A., and Sacks, R., (2004), ‘A
Practical Multi-Factor Approach to Evaluating the Risk of Investment in
Engineering Projects’, ASCE Journal of Construction Engineering and
Management, Vol. 130 No. 3 pp. 357-367.
12. Sacks, R., (2004), ‘Evaluation
of the economic impact of computer-integration in precast concrete construction’,
ASCE Journal of Computing in Civil Engineering, Vol. 18 No. 4. pp.
301-312.
13. Sacks, R., Navon, R., Brodetskaia,
14. Sacks, R., Eastman, C.M., Lee, G. and
Orndorff, D. (2005). ‘A
Target Benchmark of the Impact of Three-Dimensional Parametric Modeling in
Precast Construction’, Journal of the Precast/Prestressed Concrete
Institute, Vol. 50 No. 4 pp. 126-139.
15. Sacks, R., Navon, R., and Brodetskaia,
16. Lee, G., Eastman, C.M., Sacks, R., and Navathe, S.B., (2006). ‘Grammatical
Rules for Specifying Information for Automated Product Data Modeling’, Advanced
Engineering Informatics, Vol. 20 No. 2 pp. 155-170.
17. Sacks, R., and Harel, M., (2006).
‘An
Economic Game Theory Model of Subcontractor Resource Allocation Behavior’, Construction
Management & Economics, Vol. 24 No. 8 pp. 869-881.
18. Lee, G., Sacks, R., and Eastman, C.M., (2006).
‘Specifying Parametric
Building Object Behavior (BOB) for a Building Information Modeling System’,
Automation in Construction, Vol. 15 No. 6 pp. 758-776.
19. Ergen, E., Akinci, B., and Sacks, R., (2006). ‘Tracking and Locating Components in a Precast Storage Yard Utilizing Radio Frequency Identification Technology and GPS’, Automation in Construction, Vol. 16 No. 2 pp. 354–367.
20. Navon, R., and Sacks, R., (2007). ‘Assessing Research in Automated Project Performance Control (APPC)’, Automation in Construction, Vol. 16 No. 4 pp. 474-484.
21. Lee, G., Eastman, C.M., and Sacks, R., (2007). ‘Twelve Design Patterns for Integrating and Normalizing Product Model Schemas’, Computer-Aided Civil and Infrastructure Engineering, Vol. 22 No. 3 pp. 163-181.
22. Sacks, R., and Goldin, M., (2007). ‘Lean Management Model for Construction of High-rise Apartment Buildings’, ASCE Journal of Construction Engineering and Management, Vol. 133 No. 5 pp. 374-384.
23. Lee, G., Sacks, R., and Eastman, C.M., (2007). ‘Product Data Modeling using GTPPM - A Case Study’, Automation in Construction, Vol. 16 No.3 pp. 392-407.
24. Sacks, R., Esquenazi, A., and Goldin, M., (2007). ‘LEAPCON: Simulation of Lean Construction of High-rise Apartment Buildings’, ASCE Journal of Construction Engineering and Management, Vol. 133 No. 7 pp. 529-539.
25. Lee, G., Eastman, C.M., and Sacks, R., (2007) ‘Eliciting Information for Product Modeling using Process Modeling’, Data & Knowledge Engineering, Elsevier Science B.V., Vol. 62 No. 2 pp. 292-307.
26. Ergen, E., Akinci, B., and Sacks, R., (2007). ‘Life-Cycle Data Management of Engineered-to-Order Components Using Radio Frequency Identification’, Advanced Engineering Informatics, Vol. 21 No. 4 pp. 356-366.
27. Sacks, R., and Barak, R., (2008). ‘Impact of Three-dimensional Parametric Modeling of Buildings on Productivity in Structural Engineering Practice’, Automation in Construction, Vol. 17 No. 4 pp. 439-449.
28. Eastman, C. M., and Sacks, R., (2008). ‘Relative Productivity in the AEC Industries in the US for On-site and Off-site Activities’, ASCE Journal of Construction Engineering and Management, Vol. 134 No. 7 pp. 517-526.
29. Kaner, I., Sacks, R., Kassian, W., and Quitt, T., (2008). ‘Case Studies of BIM Adoption for Precast Concrete Design by Mid-sized Structural Engineering Firms,’ ITCON - Information Technology in Construction (accepted) Vol. 13 Special Issue - Case studies of BIM use, pp. 303-323.
30. Barak, R., Jeong, Y.-S., Sacks, R., and Eastman, C.M., (2009). ‘Unique Requirements of Building Information Modeling for Cast-in-place Reinforced Concrete’, ASCE Journal of Computing in Civil Engineering, Vol. 23 No. 2 pp. 64-74.
31. Jeong, Y.-S., Eastman, C.M., Sacks, R., Kaner,
I., (2009). ‘Benchmark
Tests for BIM Data Exchanges of Precast Concrete’, Automation in
Construction, Vol. 18 pp. 469-484.
Refereed papers in professional journals (accepted/in press)
32. Eastman, C.M., Sacks, R., Kaner, I., Jeong, Y.-S., (2009). ‘Exchange Model and Exchange Object Concepts for Implementation of National BIM Standards’, ASCE Journal of Computing in Civil Engineering (accepted).
33. Sacks, R., Rozenfeld, O., and Rosenfeld, Y., (2009). ‘Spatial and Temporal Exposure to Safety Hazards in Construction’, ASCE Journal of Construction Engineering and Management (in press).
34. Sacks, R., and Barak, R., (2009). ‘Teaching Building Information Modeling as an Integral Part of Freshman Year Civil Engineering Education’, ASCE Journal of Professional Issues in Engineering Education and Practice (accepted).
35. Sacks, R., Kaner, I., Eastman, C.M., and Jeong, Y-S., (2009). ‘The Rosewood Experiment – Building Information Modeling and Interoperability for Architectural Precast Facades’, Automation in Construction (accepted).
36. Rozenfeld, O., Sacks, R., and Rosenfeld, Y., (2009). ‘CHASTE - Construction Hazard Analysis with Spatial and Temporal Exposure’, Construction Management & Economics (accepted)
37. Sacks, R., Treckmann, M., and Rozenfeld, O.,
(2009). ‘Computer-Aided Visualization of Work Flow to Support Lean
Construction’, ASCE Journal of Construction Engineering and Management
(accepted).
Refereed papers in professional journals (submitted)
38. Rozenfeld, O.,
Sacks, R., Rosenfeld, Y., and Baum, H., (2008). ‘Construction Job Safety
Analysis’, submitted to Safety Science.
39. Sacks, R., and Partouche, R., (2009). ‘The Empire State Building
project: an archetype of “Mass Construction” ’, submitted to the ASCE Journal of
Construction Engineering and Management.
40. Tribelsky, E., and Sacks, R., (2009). ‘Can the flow of information
during the detailed design of construction projects be measured?’, submitted to
Research in Engineering Design.
Sacks, R., and Bertelsen,
S., (Eds.) (2006). Understanding
and Managing the Construction Process: Theory and Practice, Proceedings of
the 14th Conference of the International Group for Lean Construction,
Eastman, C. M., Teicholz, P., Sacks, R., and Liston, K., (2008). BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Architects, Engineers, Contractors and Fabricators, John Wiley and Sons, Hoboken NJ, USA , 495 pages.
Sacks, R., and Buyukozturk,
O., “An Expert System for Design of Reinforced Concrete Structures”, in Expert
Systems in Engineering, edited by D.T. Pham, ISBN: 0-387-19229-8 IFS
Publications/Springer-Verlag,
Educational Management Simulation Game
Sacks, R. (2004). Technion LEAPCON™ (Lean Apartment Construction) Game, 2nd Edition, January, 2007. http://www.technion.ac.il/~cvsacks/tech-leap.htm. A construction management simulation game, used by 21 universities and 11 companies in 20 countries.
1.
Warszawski, A., and Sacks, R., ‘Automation of Design and
Planning in Building - the Description of the System and the Knowledge Base’,
Israel National Building Research Institute Report #769, Haifa, 1997, 81 pages.
2.
Sacks, R., Warszawski,
A., Kirsch, U., ‘An Automated Building System - the Structural Aspect’,
Israel National Building Research Institute Report #803, Haifa, 1998, 80 pages.
3.
Eastman, C.M., Sacks, R., and Lee, G.,
‘Specification for a Precast Concrete Design and Engineering Software
Platform’,
4.
Eastman, C.M., Sacks, R., Lee, G., and
Orndorff, D., ‘PCSC Inform Task Report in Support of Development of Precast
Concrete Design and Engineering Software’,
5.
Sacks, R., and Goldin, M., ‘Management
Procedures for Client Changes – Development of a Management Model based on Lean
Construction Principles’, Research Report #1005158, Technion Research and
Development Foundation, Haifa, 2005.
6.
Sacks, R., Lee, G., Eastman, C.M., and
Orndorff, D., ‘PCSC Final Report – Assessing Development of Precast Concrete
Design and Engineering Software’, Georgia Institute of Technology,
7.
Sacks, R., and Barak,
R., ‘A Qualitative and Quantitative Assessment of the Impact of 3D Modelling of Building Structures on Engineering
Productivity’, Research Report #1005156, Technion Research and Development
Foundation,
8. Sacks, R., Kaner, I., and Esquenazi, A., ‘Improving the Competitiveness of Industrialized Components in Construction using Building Information Modeling’, Israel National Building Research Institute Report #5235239, Haifa, 2007, 168 pages.
9. Sacks, R., Rosenfeld, Y., Baum, H., and Rozenfeld, O., ‘A Lean Dynamic Quantitative Method for Planning Safety Enhancement Operations in Construction’, Israel National Building Research Institute Report #2005902, Haifa, 2007, 121 pages.
10. Eastman, C.M., Sacks, R., Jeong, Y-S., and Kaner, I., ‘Building Information Modeling (BIM) for Precast Concrete’, National Institute of Building Sciences, Washington DC, USA, 2007, 212 pages.
11. Sacks, R., Eastman, Barak, R., and Jeong, Y-S., ‘User and Functional Requirements for 3D Parametric Modeling of Cast-in-place Reinforced Concrete Structures’, Georgia Institute of Technology, Atlanta, and Technion Research and Development Foundation, Haifa, 2007, 223 pages.
12. Sacks, R., Shapira, A., Brodetskaia, I., and Partouche, R., ‘The Potential to Enhance Productivity in Construction through Industrialization using Lean Principles’, Israel National Building Research Institute Report #2008220, Haifa, 2008, 149 pages.
Conferences
and other contributed lectures
1.
2.
Modeling of Buildings Through their
Life Cycle, CIB W78 Workshop,
3.
Information Support for Building
Economics, CIB W55 Workshop,
4.
IT in Construction in Africa, CIB
W78 Workshop,
5.
ASCE Specialty Conference on Fully
Integrated and Automated Project Processes (FIAPP) in Civil Engineering, Blacksburg, VA, USA, January 2002. “An Automated
Building System - Development, Difficulties and New Directions.”
6.
7.
CEC02
Concurrent Engineering Conference,
8.
ISARC
- Nineteenth International Symposium on Automation and Robotics in Construction, NIST,
PCI
– National Convention of the Precast/Prestressed Concrete Institute,
10.
IGLC – Eleventh Meeting of the
International Group for Lean Construction, Virginia Polytechnic Institute and State University,
Blacksburg, VA, USA, July 2003. “3D Modeling and Real-time Monitoring in
Support of Lean Production of Engineered-to-order Precast Concrete Buildings.”
11.
ISARC - Twentieth International
Symposium on Automation and Robotics in Construction,
12.
Third National Conference on
Construction and Infrastructure,
Tel Aviv, November 2003. “Management Reporting in Construction Projects based
on Computerized Monitoring of Lifting Equipment.” (in
Hebrew).
13.
Grupo Dragados and Drace 3D Modeling
14.
Tekla Global Business Forum,
15.
IGLC – Twelfth Meeting of the
International Group for Lean Construction,
16.
Tekla Structures Seminar,
17.
BIBM –
18.
IGLC – Thirteenth Meeting of the
International Group for Lean Construction,
19.
IGLC – Thirteenth Meeting of the
International Group for Lean Construction,
20.
21.
ICCCBE-XI - 11th Int'l Conference on
Computing in Civil and Building Engineering,
22.
ICCCBE-XI - 11th Int'l Conference on
Computing in Civil and Building Engineering,
23.
IGLC - 14th Conference of the
International Group for Lean Construction,
24.
IGLC - 14th Conference of the
International Group for Lean Construction,
25.
IGLC - 14th Conference of the
International Group for Lean Construction,
26. Conference on Preventive Action and Research for Occupational Health and Safety, Jerusalem, Israel, June 2007. “Lean Scheduling for Safety in Construction by Predicting Risk Levels.” (in Hebrew).
27. CME25 - Construction Management and Economics: Past, Present and Future, University of Reading, UK, July 2007. “Measures of Information Flow for Lean Design in Civil Engineering.”
28. IGLC – 15th Conference of the International Group for Lean Construction, East Lansing, Michigan, USA, July 2007. “Understanding Flow and Micro-variability in Construction: Theory and Practice.”
29. Statsbygg Lean Construction Seminar, Oslo, Norway, December 2007. “Linking BIM to Lean – Lean Construction and Building Information Modelling” (invited lecture funded by hosts).
30. Georgia Tech College of Architecture Symposium “Adopting Building Information Modeling and Integrated Practice”, Atlanta, GA, USA, March 2008. “Synergy: Lean Construction and Building Information Modeling” (invited lecture funded by hosts).
31. Carnegie-Mellon University, Civil and Environmental Engineering Seminar, Pittsburgh PA, US, March 2008. "Information Flows, Resource Allocations and Safety Risks: Lean Construction Research at the Technion" (invited lecture funded by hosts).
32. IGLC – 16th Conference of the International Group for Lean Construction, Manchester, UK, July 2008. “Partial remuneration for capacity to stabilize subcontractor resource allocations”.
33. Yonsei University, Dept. of Architectural Engineering Seminar, Seoul, Korea, October 2008. “KanBIM - Lean and BIM Research at the Technion” (invited lecture).
34. ICCCBE-XII 12th Int'l Conference on Computing in Civil and Building Engineering & INCITE 2008, Beijing, China, October 2008. “R&D of BIM Exchange Standards for IFCs: A Case Study of Architectural Precast Facades.”
35. Salford University Research Institute for the Built and Human Environment (BuHu), Salford, UK, November 2008. “Synergies of Building Information Modelling (BIM) and Lean Construction” (invited lecture).
36. AEC-ST and Ecobuild Fall – buildingSMART Alliance National Conference, Washington DC, US, December 2008. “National BIM Exchange Standards for Precast Concrete.”
37. ASCE Construction Research Congress, Seattle, Washington, US, April 2009. “Production Flow in the Construction of Tall Buildings.”
38. EGLC European Group for Lean Construction Industry Day, Schaffhausen, Switzerland, April 2009. “Lean Management im Bauwesen - Building Information Modeling die Revolution der Planung” together with Prof. Manfred Breit (invited lecture).
39. 5th International Conference on Construction in the 21st Century (CITC-V), Istanbul, Turkey, May 2009. “Teaching Globalization Issues to Civil Engineering Students – The International Collaborative Construction Management Course.”
40. Design Management and Information Modelling (BIM),
Chartered Institute of Builders (CIOB) and Association of Researchers in
Construction Management (ARCOM), Ascot, UK, June 2009. “Parametric 3D
Modelling: Implications for Management of Design Professionals.”
Refereed Papers in Conference
Proceedings
1.
Warszawski, A., and Sacks, R., (1995), ‘Computer Integrated
Construction’, ISARC – 12th International Symposium on Automation
and Robotics in Construction, IMBiGS,
2.
Warszawski, A., and Sacks, R., (1995), ‘The Project
Model of an Automated Building System’, Modeling of Buildings Through their Life Cycle, CIBW78 Workshop Proceedings,
Fischer, M., Law, K.H., Luiten, B. (Eds).
3.
Sacks, R., Warszawski,
A., and Kirsch, U., (1997), ‘The Development of Knowledge Modules for Automated
Structural Design’, Information Support for Building Economics, CIBW55
Workshop Proceedings, Ruddock, L. (Ed.), Salford UK Sept 1997, CIB Publication
No. 210. pp 137-146.
4.
Sacks, R., (2001), ‘Adding
Function and Behavior to Project Model Objects to Integrate AEC Information’,
IT in Construction in Africa, CIB W78 Workshop Proceedings, South
Africa, May 2001, pp. 31-1 – 31-16
5.
Sacks, R., (2001), ‘An Automated
Building System - Development, Difficulties and New Directions’, ASCE
Specialty Conference on Fully Integrated and Automated Project Processes
(FIAPP) in Civil Engineering, Blacksburg, Virginia, USA, Sept. 2001, pp.
66-80.
6.
Warszawski, A., and Sacks, R., (2002), ‘Economic Risk
Evaluation for Residential Housing Projects’, First International Conference
on Construction in the 21st Century (ASCE CITC2002) April 2002,
7.
Sacks, R., Navon, R., and Goldschmidt,
E., (2002), ‘Project Modeling of Labor Inputs for Automated Control in Building
Construction’, First International Conference on Construction in the 21st Century
(ASCE CITC2002) April 2002,
8.
Eastman, C.M., Lee, G., and Sacks, R.,
(2002) ‘A
New Formal and Analytical Approach to Modeling Engineering Project Information
Processes’, Distributing Knowledge in Building, CIB W78 Workshop, Aarhus, Denmark, June 2002, Vol. 2 pp.125-132.
9.
Sacks, R., Eastman, C.M., and Lee, G.,
(2002) ‘Information and Process Flow in Models of Precast Concrete Design and
Construction’, CEC02 Concurrent Engineering Conference, UC Berkeley,
July 2002, pp. 51-62.
10. Eastman, C.M., Lee, G., and Sacks, R.,
(2002) ‘Deriving a Product Model from Process Models’, ISPE/CE2002
Concurrent Engineering Conference, Cranfield
University UK, July 2002, pp. 429-438.
11. Lee, G., Sacks, R., and Eastman, C.M.,
(2002) ‘Dynamic Information Consistency Checking in the Requirements Analysis
Phase of Data Modeling’, in ‘eWork and eBusiness in Architecture, Engineering and Construction’,
Turk., Z., and Scherer, R., (Eds), proceedings of
ECPPM - European Conference for Process and Product Modeling, Slovenia,
September
12. Sacks, R., Navon, R., Shapira, A., and Brodetzkaia,
I., (2002) ‘Monitoring Construction Equipment for Automated Project Performance
Control’, ISARC – 19th International Symposium on Automation and
Robotics in Construction, Stone, W. (ed.),
13. Eastman, C.M., Sacks, R., and Lee, G.,
(2002) ‘Strategies for Realizing the Benefits of 3D Integrated Modeling of
Buildings for the AEC Industry’, ISARC – 19th International
Symposium on Automation and Robotics in Construction, Stone, W. (ed.),
14. Sacks, R., Akinci,
B. and Ergen, E., (2003) ‘3D Modeling
and Real-time Monitoring in Support of Lean Production of Engineered-to-order
Precast Concrete Buildings’ Proceedings of the 11th Annual
Conference on Lean Construction, Martinez, J., and Formoso,
C., (eds.), Blacksburg, VA, USA, July 2003. Virginia Polytechnic Institute and
15. Sacks, R., Navon, R., Shapira, A. and Brodetzkaia,
I., (2003) ‘Monitoring Lifting Equipment for Automated Progress Control: A
Feasibility Study’ ISARC – 20th International Symposium on
Automation and Robotics in Construction, Maas, G., and van Gassel, F., (eds.), Eindhoven,
The Netherlands, September 2003. Techniesche Universiteit
16. Ergen, E., Akinci, B., and Sacks, R., (2003) ‘Automation of effective
tracking and locating of precast components in a storage yard’ EIA9:
E-Activities and Intelligent Support in Design and the Built Environment,
17. Eastman, C. M., Lee, G., and Sacks, R.,
(2003). ‘Development of a Knowledge-Rich CAD System for the North American
Precast Concrete Industry’, ACADIA 22: Connecting—Crossroads of Digital
Discourse,
18. Sacks, R., Navon, R., Shapira, A., and Brodetzkaia,
19. Eastman, C. M., Sacks, R., and Lee, G.,
(2004). ‘Functional Modeling in Parametric CAD Systems’, Generative CAD
Systems G-CADS 2004, O. Akin (Ed.), Pittsburgh PA, Carnegie Mellon University.
20. Eastman, C. M., Sacks, R., and Lee, G.
(2004). 'Implementing 3D Parametric Modeling in Technical Areas of Construction
- a Case Study', CIB 2004 World Congress,
21. Sacks, R. (2004). 'Towards
a lean understanding of resource allocation in a multi-project sub-contracting
environment', Proceedings of the 12th Annual Conference on Lean
Construction, S. Bertelsen (Ed.), Elsinore, Denmark, August 2004, pp. 97-109.
22. Lee, G., Sacks, R., Eastman, C. M., and
Wessman, R. (2004). 'Development
of an intelligent 3D parametric modeling system for the North American precast
concrete industry: Phase II.' ISARC – 21st International
Symposium on Automation and Robotics in Construction,
23. Sacks, R., and Barak,
R. (2005). 'A
Methodology for Assessment of the Impact of 3D Modeling of Buildings on
Structural Engineering Productivity.' ASCE
Conference on Computing in Civil Engineering 2005, Cancun, Mexico, L. Soibelman and F. Pena-Mora, eds., 41.
24. Sacks, R., Goldin, M., and Derin, Z. (2005). 'Pull-driven
construction of high-rise apartment buildings' Proceedings of the 13th
Conference of the International Group for Lean Construction, R. Kenley (Ed.), Sydney, Australia, pp. 217-226.
25. Sacks, R., Rozenfeld,
O., and Rosenfeld, Y., (2005). 'Lean
scheduling for safety: development of a time-dependent risk level model', Proceedings
of the 13th Conference of the International Group for Lean Construction, R.
Kenley (Ed.), Sydney, Australia, pp. 513-520.
26. Lee, G., Eastman, C.M., and Sacks, R.,
(2006). 'Generating IFC VIEWs and Conformance Classes
using GTPPM', ICCCBE-XI - 11th Int'l Conference on Computing in Civil and
Building Engineering, H. Rivard and E. Miresco, (Eds.), Montreal, Canada, pp. 1715-1724.
27. Sacks, R., and Derin,
Z., (2006). ''WORKMANAGER' - an Online Interface for Lean Flow Control in
Apartment Building Construction', ICCCBE-XI - 11th Int'l Conference on
Computing in Civil and Building Engineering, H. Rivard
and E. Miresco, (Eds.), Montreal, Canada, pp.
1176-1185.
28. Sacks, R., and Barak,
R., (2006). 'Quantitative
Assessment of the Impact of 3D Modelling of Building
Structures on Engineering Productivity', ICCCBE-XI - 11th Int'l
Conference on Computing in Civil and Building Engineering, H. Rivard and E. Miresco, (Eds.),
Montreal, Canada, pp. 1186-1195.
29. Rosenfeld, Y., Rozenfeld,
O., Sacks, R., and Baum, H., (2006). 'Efficient and Timely Use of Safety
Resources in Construction', Global Unity for Safety and Health in Construction
- Proceedings of the CIB W99 International Conference on Construction Safety, D.
Fang, R.M. Choudhry and J.W. Hinze
(Eds.), Beijing, China, pp. 290-297.
30. Harel, M., and Sacks, R., (2006). 'Subcontractor
Resource Allocation in a Multi-project Environment – Field Study', Understanding
and Managing the Construction Process: Theory and Practice, Proceedings of the 14th
Conference of the International Group for Lean Construction, R. Sacks and
S. Bertelsen, (Eds.), Santiago, Chile, pp.
467-478.
31. Esquenazi, A., and Sacks, R., (2006). 'Evaluation
of Lean Improvements in Residential Construction using Computer Simulation',
Understanding and Managing the Construction Process: Theory and Practice,
Proceedings of the 14th Conference of the International Group for Lean
Construction, R. Sacks and S. Bertelsen, (Eds.),
Santiago, Chile, pp.137-149.
32. Sacks, R., and Harel, M.,
(2006). 'How Last Planner Motivates Subcontractors
to Improve Plan Reliability - a Game Theory Model', Understanding and Managing the Construction
Process: Theory and Practice, Proceedings of the 14th Conference of the
International Group for Lean Construction, R. Sacks and S. Bertelsen, (Eds.), Santiago, Chile, pp. 443-454.
33. Rozenfeld, O., Sacks, R., Rosenfeld, Y., and Baum, H., (2007). ‘Construction Job Safety Analysis in Support of Lean Project Management’, Proceedings of CME25 Construction Management and Economics: Past, Present and Future, University of Reading, July 2007. W. Hughes (Ed.), Taylor and Francis, London, UK.
34. Tribelsky, E., and Sacks, R., (2007). ‘Measures of Information Flow for Lean Design in Civil Engineering’, Proceedings of CME25 Construction Management and Economics: Past, Present and Future, University of Reading, July 2007. W. Hughes (Ed.), Taylor and Francis, London, UK.
35. Bertelsen, S., and Sacks, R. (2007). 'Towards a new Understanding of the Construction Industry and the Nature of its Production.' Proceedings of the 15th Conference of the International Group for Lean Construction, C. Pasquire and P. Tzortzopoulous (Eds.), Michigan State University, East Lansing, Michigan, pp. 46-56.
36. Brodetskaia, I., and Sacks, R. (2007). ‘Understanding Flow and Micro-variability in Construction: Theory and Practice’, Proceedings of the 15th Conference of the International Group for Lean Construction, C. Pasquire and P. Tzortzopoulous (Eds.), Michigan State University, East Lansing, Michigan, pp. 488-497.
37. Barak, R., Jeong, Y-S., Sacks, R. and Eastman, C.M., (2007). ‘Unique Requirements of Building Information Modeling for Cast-in-place Reinforced Concrete’, Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering, L. Soibelman and B. Akinci (Eds.), Carnegie-Mellon University, Pittsburgh, PA, pp. 264-271.
38. Partouche, R., Sacks, R., and Bertelsen, S. (2008). ‘Craft construction, mass construction, lean construction: lessons from the empire state building’, Proceedings of the 16th Annual Conference of the International Group for Lean Construction IGLC16, P. Tzortzopoulos and M. Kagioglou, (Eds.), University of Salford, Manchester, UK, pp. 183-194.
39. Sacks, R., and Harel, M. (2008). ‘Partial remuneration for capacity to stabilize subcontractor resource allocations’, Proceedings of the 16th Annual Conference of the International Group for Lean Construction IGLC16, P. Tzortzopoulos and M. Kagioglou, (Eds.), University of Salford, Manchester, UK, pp. 109-120.
40. Sacks, R., Eastman, C. M., Kaner, I., and Jeong, Y.-S. (2008). ‘R&D of BIM Exchange Standards for IFCs: A Case Study of Architectural Precast Facades’, ICCCBE-XII & INCITE 2008, A. Ren, ed., Tsinghua University, Beijing, China.
41. Sacks, R., and Partouche, R. (2009). ‘Production Flow in the Construction of Tall Buildings’, ASCE Construction Research Congress, S. Ariaratnam and E. Rojas (Ed.), University of Washington, Seattle, Washington, US, pp. 1019-1028.
42. Soibelman, L., Akinci, B., Sacks, R., Dikmen, I., Birgonul, M.T., Formoso, C., and Isatto, E. (2009). ‘Teaching Globalization Issues to Civil Engineering Students – The International Collaborative Construction Management Course’, 5th International Conference on Construction in the 21st Century (CITC-V) “Collaboration and Integration in Engineering, Management and Technology,” S. Azhar (Ed.), Istanbul, Turkey, pp. 1104-1112.
43. Brilakis, I., Lourakis, M., Sacks, R. Savarese, S., Christodoulou, S., Teizer, J. and Makhmalbaf, A., (2009). ‘Automated Generation of Parametric BIMs based on Hybrid Video and Laser Scanning Data’, 16th EG-ICE Workshop on Intelligent Computing in Engineering &Architecture, Berlin, Germany, pp. XX-XX.
44. Sacks, R., Dave,
B., Koskela, L., and Owen, R., (2009). ‘Analysis Framework for the
Interaction between Lean Construction and Building Information Modelling’,
Proceedings of the 17th Annual Conference of the International Group for Lean
Construction IGLC17, Y. Cuperus and E. Hirota, National Pingtung University of
Science & Technology, Taipei, Taiwan, pp. XX-XX.
Other Papers in
Conference Proceedings
45. Sacks, R., Wessman, R., Eastman, C. M., Lee, G., and Orndorff, D. (2005). '3D parametric modelling of precast structures - a revolutionary change', 18th BIBM International Congress and Exhibition, M. Borghoff, A. Gottschalg, and R. Mehl, eds., Amsterdam, Netherlands, pp. 115-116.
46. Bertelsen, S., and Sacks, R. (2007). ‘Contractual vicious circles: a Process Approach to Understanding the Construction industry’s Performance’, Managing the Construction of Buildings, November 2007, Copenhagen Business School, Copenhagen, Denmark, 12 pages.